Want create site? Find Free WordPress Themes and plugins.

Overview of Infrastructure

  • Immediate Development – 22.54 Sq. km. (Activation Area)
  • Roads – 300 Lane km
  • Power Availability – 380 MW
  • Pipelines – 400 km
  • WTP capacity – 50 MLD
  • STP capacity – 10 MLD
  • CETP capacity – 20 MLD
  • Storm water – 6 km open canal
  • 140 km underground ducting

Smart Infrastructure

State-of-the-art, smart and sustainable infrastructure facilities set Dholera apart. Its world class infrastructure is benchmarked against the best practices from around the world. It is unique as it is the first city in India where all underground utilities like gas, power, potable water, recycled water, sewage pipes and storm water is pre-planned for complete development, with the capability of handling the growing demands of the city.

Plug and Play
Right from the start, the vision has been to have a ‘Plug & Play’ approach wherein all the land parcels are fully ICT enabled and completely built up infrastructure is offered right at plot level. This will be an underlying enabler in all spheres of the city and will integrate multiple essential disciplines, which will in turn facilitate ease of doing business and holistic living, along with a platform for efficient operations and administration.

Safety and Security
Dholera’s Command and Control Centre has been designed to oversee safety & security, and will seamlessly merge city departments to enable collaboration for efficiency.

Efficient Transit Network
Dholera’s planning includes safe and well controlled roads with Multi-Purpose corridors, Bicycle Tracks, Service Roads, shaded pedestrian friendly walkways for comfort and safety, constant monitoring by CCTV cameras and a dynamic intelligent Traffic Management system.

Roads & Underground Services

  • 72 km of Roads
  • Security & Surveillance
  • Shaded Pedestrian
  • Traffic Management
  • Integrated Signal System
  • Emergency Management
  • Dedicated Cycle track
  • Real Time Information
  • Road Design based on IRC
  • Future proofed (Dig-proof Development)
  • LED Street Lights
  • RoW – 18 to 70 m – 4 & 6 lane roads

Expected Completion by September 2019

Total Road Length

72 km

Contractor

L&T

Construction Cost

1734 Cr.

Power

  • 3 – 66kv Sub Stations & 2 – 220kv Sub Stations
  • 400kV Transmission Line – 100 km
  • 115 km Underground Ducting Network
  • Connectivity costs & Power tariff to be charged by Discom, basis GERC norms
  • Underground Network 11 kv to 66 kv
  • Availability from March 2019
  • Dual Circuit Transmission line
  • Renewable Energy – Solar
  • Real Time Information
  • N+1 Redundancy with Smart Grid (RMUs)

Water & Waste Water Management

Potable Water

  •  Raw Water Source (100 MLD from Narmada Saurashtra Branch Canal)
  •  50 MLD Pure Water Treatment Plant
  •  10 ML Reservoir
  •  82 km of Pipeline
  •  Network Losses < 5%
  •  Average supply per connection – 10 MLD
  •  Allotment – 150 lpcd for residential use
  •  Availability from September 2019
  •  Intelligent Network – Smart Metering
  •  Looped Network for uninterrupted supply
  •  Road parallel network within ROW
  •  Part of Plug & Play connectivity (plot)

Water Treatment Plant

  • 24×7 Supply
  • 150 lpcd
  • NRW < 5%
  • Smart Metering
  • Reduction of Fresh Water Demand by 30%
  • Intelligence Network
  • Demand Supply Management
  • Real Time Information
  • 50 MLD water treatment plant is under construction expandable to 150 MLD for future development
  • Total WTP Capacity 50 MLD
  • Contractor SPML
  • Construction Cost ₹90 Cr.

Integrated Solid Waste Management

  • Facility Area – 28 ha
  • 25 TPD Segregation Plant
    • Bio-degradable
    • Recyclable
    • Others (Landfill)
  • 30 TPD Bio-Methanation Plant – For Bio-degradable waste
  • 250 TPD Industrial (Non-Haz) Waste management Facility – Saleable & Recyclable
  • 25 TPD Incinerator – For Hazardous Waste
  • 1 TPD E-Waste Facility
  • Scientifically planned & managed land-fill
  • SCADA Management system
  • ‘At Source’ Segregation
  • 100% Waste Collection
  • Waste to Energy
  • Street Sweeping
  • Twin Bin System
  • Information, Education and Communication (IEC)
  • Recycling
  • GPS enables Vehicle tracking system

City-wide sensor network

Sewage Treatment Plant (STP) & Common Effluent Treatment Plant (CEPT)

  • Detailed design of STP is under progress by the contractor
  • 10 MLD Sewage treatment plant for 100% under construction which is modular and provision of expansion for future development
  • 24×7 Supply
  • Intelligence Network
  • 100% Waste collection
  • Demand Supply Management
  • 100% recycling
  • Real Time Information
  • Zero discharge

STP Details

Total STP Capacity

10 MLD

Contractor

L&T

Construction Cost

53.9 Cr.


CETP Details

Total CETP Capacity

20 MLD

Contractor

TBD

Estimated Cost

145 Cr.

Dholera on DMIC

Did you find apk for android? You can find new Free Android Games and apps.